Tuesday, January 13, 2009

Construction Drawings for the New Addition

These are the line drawings of the new construction.

This one is the West Side view - if you're standing at the Caboose Park or at the Courthouse, this is what you will see:

You can see that it is 2 levels. The missing piece underneath at the back of the building is where the existing stone/concrete walls are at the back of the parking lot; the back part of the second floor will be built into the hillside. In the next post I'll show you pictures of the parking lot asphalt being removed in preparation for digging in the footings.

Here's the streetside (south face) view:

These pictures are just pictures of drawings on paper. I didn't realize that the existing building looks crooked until I uploaded this. It wasn't drawn that way; the paper was not flat when I took the picture.

2 comments:

Anonymous said...

hi

i love the coffee house and alway friendly service and i'm looking for to seeing the new addition

MK said...

Thank you for stopping in! I hope to see more of you here on the site and in The 123.
:)