Saturday, February 7, 2009

Construction Pictures, etc.

These pictures are about 2 weeks old (I told you in the last post that I was running behind. Again.); you can tell because the ground is not covered in snow and ice and the sun is shining.

Until today, there has been nothing but snow, more snow, ice, gloom, and more snow.
Today, while not sunny, the temperature is above freezing for the first time in at least a couple of weeks.

During this prior brief, sunny, but barely above freezing period, a few rows of block were laid.

Here's the site during preparation, before mixing mud:

Fortunately, this mess in the parking lot (Yes, PC, it is a mess. An understandable mess, and a temporary mess, but it is a mess.) doesn't effect the path to the front door:
Block laying:
This is what it looks like now, even two weeks later. There has been some other digging going on for plumbing, but that's been hard fought: the ground is frozen.
If this current run of above freezing weather holds for a few days, the ground can thaw enough to pour the concrete floor. After that, there will be more block and then the wood framing. At that point it will begin to look like something pretty quickly.
Let's hope the weather holds.

No comments: