Just because I've been slacking on the blog doesn't mean work at The 123 is slacking. The drywall is hung and the mudding has started. Also, some of the plumbing that needed rerouted for both the first and second floors has been finished.
Now that the flu has finally loosed its grip, I will update pictures and post some color samples soon.
And even though the temperatures remain wintry, little yellow coltsfoot flowers are popping out of the hillside, so there is hope for spring - soon.
Monday, March 17, 2008
Springtime - post-flu catch-up post
Subscribe to:
Post Comments (Atom)
No comments:
Post a Comment