PC pointed out that we didn't have current outside view pictures posted here on the site.
He took a few and I'm posting these 2:

The loft is open, too, so I should be posting some of those pics soon.
Also, the back patio concrete will be poured this weekend, so private outside seating is soon to come...
Tuesday, June 29, 2010
Stage Side Picture Update
Monday, July 13, 2009
Bathroom wall progression (scramble continued)
Around the 25th of June, the inside space of the lower floor was wide open concrete. Following the plans we'd devised for the bathrooms, I laid ceramic tile in a 12x12 foot area so that the bathroom walls could be built on top of the tile (it's much easier than piecing in the tile around the walls later).
The following picture was taken on July 1st, the day after the bathroom walls were built:
Electric and plumbing were installed before this next picture was taken on July 3rd:
This next picture is taken from a higher angle (on the stairs), but it shows the bathroom wall with drywall. It was taken on July 4th:
The drywall was mudded on July 5th, painted (primed white) on the 6th. Bathroom doors, toilets, and sinks were installed on the 7th. Switches, outlets, lights, and ceiling fans went in on the 8th.
On the 9th, the stage was built and temporary lights and sounds installed:
This is Skip from Mirage Sound Company (THANK YOU, Skip!). By the time this picture was taken, it's already the 10th, but it's about 1:00am. Skip not only installed a temp system, but painted the beam he's hanging the lights on (How's that for service?)!
This is a pretty good crash course in what it took to make it happen, but there's a ton of little things that need done along the way. We had quite a few friends who stopped in at odd hours and helped out. If it wasn't for all their help, this never could have happened. For all your help, we are truly grateful. I hope you all come to relax and enjoy the music often. Thank you!
Sunday, July 12, 2009
The scramble to get ready for live music...
Saturday, July 11, 2009
WOW!
What a week!
It's way past my bedtime, so this has to be short (I promise a longer post in the next couple of days):
THANK YOU!
I am very thankful for all the wonderful folks who have made this an amazing week!
Monday, June 22, 2009
Stairs
Here's a shot of the stairs (PC's camera; mine's still not working) during construction.
They don't go anywhere yet:
But thanks to these guys, Charlie and his son Chuck (Charlie's wife keeps a blog here), they go all they way up:
The stairs are sure a lot easier to go up and down than the ladder.
Saturday, June 20, 2009
Expansion - Construction Progress
There is progress, but you can't see it here because my camera quit working.
A few highlights:
- Stairs! Yay! Thanks to Carpenters Charlie and Chuck we have stairs in the new addition! We've gotten so used to going up and down the ladder, it's going to take a few days to remember to use them.
- Tile in the bathrooms. No walls or anything else, but the tile is laid and the grout will finish it off by Monday.
- Windows. The windows are now installed in the first floor, too.
So, yes, definite progress!
Now that we're so close to having the first floor usable, there's some progress on getting some good music on the event schedule, too, so keep checking back....
Wednesday, May 20, 2009
Adding On: Progress Pics
Ridgepole construction is almost complete in this picture:
Here's the "topping off" flag:
'Topping off' is explained well in this article:
http://www.oucom.ohiou.edu/news/stories/topoff/
“Topping off” a building is an old tradition among construction workers. When the topmost structural element of a multi-story building is in place, workers signify the occasion by placing a small evergreen tree or flag on top. The new ARC building has both. Often, construction workers sign the last steel beam before it is hoisted into place.
"According to some traditions, the tree symbolize that construction so far has occurred without injury or death to the workers, while others say it provides good luck to the future inhabitants.
"Scott L. Melnick wrote in the December, 2000, issue of Modern Steel Construction that the origin of the practice is uncertain but likely traces back thousands of years to either Scandinavians or Germans, who often built with the plentiful evergreen trees scattered throughout northern Europe. Some legends, Melnick said, even date the practice back to early Romans. "
I've seen PC 'top off' quite a few buildings. He's used both evergreens and flags. It's almost Memorial Day in the Memorial City, so the flag seems appropriate.
The roof rafters begin (yep, the flag is still there, just hard to see):